How long does it take to paint a house?

Knowing how long the painters will be there helps you plan around work, kids and pets.

Here are realistic timeframes for typical Adelaide jobs, plus a simple checklist to keep things moving.

Typical timeframes

JobTypical timeNotes
Single room1 day2 days if lots of repairs
3-bedroom interior5 – 8 daysIncluding ceilings, doors and trims
Single-storey exterior5 – 10 daysWeather dependent
Double-storey exterior2 – 3 weeksScaffold setup adds time
Roof painting3 – 5 daysCleaning and drying time included
Rough guide only. We give you a start date and timeline with your quote.

What slows a job down

  • Repairs: Cracked plaster, rotten timber and water damage add days.
  • Weather: Rain and heatwaves pause exterior work.
  • Colour changes: Extra coats need extra drying time.
  • Occupied homes: Working around furniture and people takes a little longer.

How to prepare your home

Before we arrive

  • Clear small items and breakables
  • Take down artwork and curtains
  • Let us know about pets and access
  • Park cars away from the walls

Leave to us

  • Moving heavy furniture
  • Covering floors and gardens
  • Removing switch plates
  • Cleaning up each day

"We clean up at the end of every day, so you're never living in a building site."

— Mike, Mike's Professional Painting

Want a timeline for your job?

Every quote comes with a start date and an expected finish.

Frequently asked questions

Can I live at home while you paint?

Yes. We work room by room inside and keep the house usable.

How long before I can move furniture back?

Usually the same evening for walls. Freshly painted doors and trims need a little longer before heavy use.

Do you work weekends?

Our standard hours are Monday to Friday. Ask if you need something different.