Process / Method
Slow where it matters.
Five steps on every job. Keep scrolling to tear through them.
01
Step 1 of 5
Prep
Wash, scrape, fill and sand. Furniture, floors and gardens protected. This is most of the job, and the part we never rush.
Scroll to tear ↓
02
Step 2 of 5
Prime
Bare timber, new plaster, repairs and stains sealed so the finish coats bond and dry evenly.
Scroll to tear ↓
03
Step 3 of 5
Cut-in
Clean lines by hand at ceilings, trims and fixtures. No tape lines left behind.
Scroll to tear ↓
04
Step 4 of 5
Two coats
Two full finish coats as standard, with drying time respected between them.
Scroll to tear ↓
05
Step 5 of 5
Walkthrough
We walk the job with you, mark anything you want looked at, and finish touch-ups before we pack up.
Start with step one: a quote.
Free on-site quotes across Adelaide. Itemised, written, no pressure.
Request a quoteCall 0418 802 957